Our Traditional Fast DC EV Charger, model BESS120, is a
cutting-edge dual-port DC charging solution engineered with an integrated
energy storage system (ESS)—redefining efficient, grid-friendly fast
charging for electric vehicles with a peak output power of up to 120kW.
What sets this innovative charger apart is its exceptional energy optimization:
it operates with a mere 40kW grid input and is equipped with a
high-capacity 100kWh battery pack, delivering blistering fast charging
performance to EV users without placing excessive load on the existing power
grid. This grid-decoupled design eliminates the common pain point of grid
overload, making it a game-changing solution for areas with limited grid
capacity or where peak power draw restrictions apply.
Designed for maximum ease of deployment and
cost efficiency, the BESS120 features intuitive Plug & Play
functionality that streamlines integration with any existing power grid
infrastructure. There is no need for costly civil construction, complex grid
upgrades, or time-consuming electrical reconfigurations—simply connect the unit
to the available power supply, and it is ready to operate at full capacity.
This plug-and-play design drastically reduces installation timelines and
upfront capital expenditure, allowing operators to quickly deploy charging
capacity and start serving EV users with minimal downtime and investment.
Unmatched in versatility and adaptability,
the BESS120 breaks free from the constraints of grid capacity and
infrastructure limitations, enabling flexible deployment anywhere EV
charging is needed. Whether it’s a suburban parking lot, a rural retail center,
a highway rest stop, a commercial office park, or a residential community with
constrained grid power, this charger delivers consistent, reliable, and
high-power DC charging performance without the need for costly grid
reinforcement. Its dual-port design further maximizes utilization, allowing two
EVs to charge simultaneously (at variable power outputs based on demand) and
increasing the overall charging throughput for operators.
Beyond its core performance and deployment
advantages, the integrated energy storage system of the BESS120 also delivers
additional operational benefits: it can draw power from the grid during
off-peak hours (when electricity costs are lower) to charge its internal
battery, then supply that stored energy for EV charging during peak demand
periods—helping operators reduce energy costs and optimize their power
consumption strategy. This not only lowers operational expenses but also
supports grid stability by reducing peak-time power draw from the utility
network.
Built for long-term reliability and low
maintenance, the BESS120 combines robust engineering with high-quality
components to withstand continuous commercial use in diverse environmental
conditions. It is the ultimate all-in-one fast DC charging solution for
operators looking to expand their EV charging network cost-effectively, quickly,
and sustainably—without compromising on charging speed, performance, or
grid compatibility. China manufacturer offers high-quality industrial products with competitive pricing and advanced
production capabilities.
